Incentive 1 (I1) Incentive 2 (I2) Response Rate 1 (RR1) Response Rate 2 (RR2) Adjustment factor (α eq) Adjusted Response Rate 1 (ARR1) Adjusted Response Rate 2 (ARR2) Equivalent Cost-per-complete (C1 = C2)
$2 $10 48.50% 33.50% -0.006749 -- -- --
$2 $20 48.50% 42.40% 0.1296 6.29% 5.50% $104.21
$10 $20 33.50% 42.40% 0.2851 9.55% 12.09% $59.04